Despite the depressing news the other day about the priming yet to be done, last Friday was a great day on Hawthorne Avenue. Not only did the electrician complete the wiring for the speaker system, but the house PASSED the rough-in inspection and the first layer of insulation was put in.
|
One layer of closed-cell insulation is sprayed between the studs on every exterior wall |
|
The closed cell foam is a light lavender
|
The insulation installation continued both Monday and Tuesday. Wallace spent several days since last Friday
pulling the remaining nails and removing screws from the wall studs and ceiling joists to ready the house for drywall installation. Wallace has finished his aspect of the prep work and today the insulation job should be complete.
I'll let you know where we stand once I check the house later today!
No comments:
Post a Comment