We've been working recently on the master bath. Removing old flooring, replacing flooring, building walls, altering same walls, moving same walls. All this while hired contractors (HVAC, window, electrical, & plumbing) attempt to get their work done around us. It has been most challenging to the plumbing contractor who has had to move his shower pipes and drain more than once. (Thank you James for the enormous amount of patience you've shown us. Your work has been tip-top. We promise not to move or rebuild another wall.)
|
This is the back wall of the walk in shower. See the header and rectangle near the top. This will hold a window
which came from the original carriage house (no longer standing) and allow light from the west into the space.
|
|
Wallace pulls up old flooring and prepares to replace with 3/4 ply in the shower stall.
|
|
Plumbing for the shower is in and the shower 'vestibule' is complete. On the right is a
floor to ceiling wall and on the left is a knee wall separating the shower from the toilet.
|
|
Billye tests out the new plywood flooring and wonders,
"So, where is this shower you told me was up here?"
|
No comments:
Post a Comment